New Generation Biomass Conversion Facility

One process three products

Carbon, Biochar, Activated Carbon

Technicial Specifications

EXPLANATION Model/Units BKC-2 BKC-4 BKC-6 BKC-8 BKC-10 BKC-12
ANNUAL RAW CONSUMPTION CAPACITY  (**~humidity 10%)  Ton/year 5.760 11.880 23.760 36.000 54.000 72.000
** The production capacity was defined based on the characteristics of these nutshells from Samsun, Turkey. Different plant parameters may apply to other raw materials.
               
Production time p.a.(technical maximum operating time) [Hours] 8.160 8.160 8.160 8.160 8.160 8.160
Production time p.a.(operating hours) [Hours] 7.200 7.200 7.200 7.200 7.200 7.200
Operator [Qty]     Depends on the Material handling (1-3 Operator per day)
Maintenance time (main) [Hours] 200 200 200 200 200 200
Maintenance time (frequent small maintenance, inspections etc.) [Hours] 100 100 100 100 100 100
One unit / hour loading capacity [kg/Hour] 400 825 1.650 1.250 1.875 2.500
Annual Activated Carbon Production Capacity [Ton/Year] 1.000 2.000 4.000 6.000 9.000 12.000
Number of biomass loading units [Unit] 2 2 2 4 4 4
Annual Biochar Production Capacity [Ton/Year] 2.304 4.752 9.504 14.400 21.600 28.800
Number of combustion chamber units [Unit] 2 2 2 4 4 4
Combustion chamber internal volume [m³] 10 20 35 25 40 50
Number of chimneys [Unit] 2 2 2 4 4 4
Total flue gas flow (Biochar production) [ kg/hour] 3.120 6.400 12.870 19.500 29.250 39.000
Total flue gas flow (Activated carbon production)  [kg/hour] 3.600 7.425 14.850 22.500 33.750 45.000
Chimney inside Diameter before recuperator (insulation will be made outside this diameter) [mm] 500 650 900 800 1.000 1.100
Number of carbonization units [Unit] 2 2 2 4 4 4
Number of activation units [Unit] 2 2 2 4 4 4
carbonization capacity [Ton/day] 8 16 32 48 72 96
Activation capacity [Ton/day] 3 7 13 20 30 40
Number of recuperators [Unit] 1 2 2 3 3 4
* Recuperator capacity for hot air (No electricity generation) for 1 unit [kcal/hour] 750.000 1.400.000 2.800.000 2.100.000 3.200.000 4.250.000
* Recuperator capacity for hot air (No electricity generation)  [kW] 872 3.256 6.513 7.327 11.165 19.771
* Recuperator capacity for hot air (No electricity generation)  [kWh] 0 0 0 0 0 0
* Annual Energy Recuperation (No electricity generation)  [MWh] 0 0 0 0 0 0
* Recuperator heating surface area [m²] 65 125 215 175 250 350
Cooling Tower Capacity [kcal/hour] 75.000 100.000 200.000 250.000 400.000 500.000
Cooling Tower Capacity [kW] 87 116 233 291 465 582
Cooling Tower Energy [kWh] 0 0 0 0 0 0
Cooling Tower Energy [MWh] 0 0 0 0 0 0
Cooling Tower engine power [kw] 2 4 6 8 10 12
               
               
EXPLANATION Model/Units BKC-2 BKC-4 BKC-6 BKC-8 BKC-10 BKC-12
ANNUAL RAW CONSUMPTION CAPACITY  (~humidity 10%)  Ton/year 5.760 11.880 23.760 36.000 54.000 72.000
               
Steam capacity produced by steam boiler in activated carbon production (for 1 unit) [kg/hour] 550 1.100 2.200 3.000 4.500 6.000
Saturated Steam outlet temperature in Activated Carbon production (at 16 bar pressure) [°C] 204 204 204 204 204 204
Boiler energy capacity in activated carbon production (for 1 unit) [kcal/hour] 450.000 750.000 1.500.000 1.150.000 1.700.000 2.275.000
Boiler capacity in activated carbon production  [kW] 1.047 1.745 3.489 5.350 7.908 10.583
Boiler energy in activated carbon production [kWh] 0 0 0 0 0 0
Boiler energy in activated carbon production [MWh] 0 0 0 0 0 0
Turbine electricity generation capacity in activated carbon production (for 1 unit) [kWhe] 125 225 500 350 550 700
Annual electricity generation (total for the facility) 300 days a year and 24 hours at full capacity [kWhe] 1.800.000 3.240.000 7.200.000 10.080.000 15.840.000 20.160.000
Turbine electricity generation capacity in biochar production (for 1 unit) [kWhe] 100 180 400 280 440 560
Annual electricity generation (total for the facility) 300 days a year and 24 hours at full capacity [kWhe] 1.440.000 2.592.000 5.760.000 8.064.000 12.672.000 16.128.000
Facility layout dimensions Width x Length x Height The equipment dimension is jointly designed with the customer.
Facility settlement volume cubic m³ [ m³]
Total installed engine power of the system conceptual phase.
               
Note :              
* If electricity is produced by the steam turbine, the above recuperator capacities will change. It will decrease to smaller capacities.              

Our Difference

EXPLANATION BKC Other
Availability of Different Raw Materials Yes No
Critical Movable Equipment Exposed to Heat None Available
Material Movement Natural flow by gravity Forced flow with rotational motion
Thermal Insulation Perfect Normal
Products Carbon, Biochar, Activated Carbon Activated Carbon
Maintenance Easy Hard
Process Heat Utilization Available None
Risk of Technical Failures Very low High
Energy Efficiency Perfect Poor
Product Quality Perfect Normal
Carbon Content Adjustable Stable

Solutions

The new generation systems we produce are superior to their peers in terms of energy efficiency and technology. Our systems can meet all heat energy needs with their own heat energy without the need for external energy. Three different high quality products (Carbon, Activated Carbon and Biochar) can be obtained from a single plant. It is possible to generate electricity from the waste heat of the plant. All kinds of biomass can be used as raw material for production.

Our facilities can receive carbon certificate.

Areas of Application

BKC Machinery

30 Years

Experience

Contact information

Address:Toybelen Mahallesi No:4 1174 Sokak B1/7 Blok Keresteciler Sitesi - İlkadım Samsun

Phone:+90 (362) 439 27 72

Email:info@bkcmakina.com